SO I have my Minibrute 2S and 6U Rackbrute, now I would like to add another 6U Rackbrute (above the existing one).
It would be great if the 6U had additional screws on the upper sides to install another 6U on top. Anyone done anything DIY adding another 6U to their existing setup?
How would Arturia advise adding a second 6U to a Minibrute/6U Rackbrute set up?