Hi!
When I'm changing time division on sequencer 1 or sequencer 2 its doesn't affect Clock out timing, and both sequencer can have different time divisions, for example Sequencer 2 1/4, and Sequencer 2 1/6, but when i change time division for Drum track it immediately affect Clock out timing and it becoming exactly which time division was set by me.
Im not sure if it's normal behaviour of BSP.
Bug?
Please let me know if anybody familiar with this issue.
Thanks in advance!
P.S. In MCC Clock out set to 1 step.