Arturia Forums
Hardware Sequencers => BeatStep Pro => BeatStep Pro - Technical Issues => Topic started by: siseturist on July 21, 2015, 05:40:22 pm
-
In the manual there's a section about copying sequences:
7.3 Copy between SEQ1 and SEQ2
There may be times when you would like to have both sequencers playing the same
thing, perhaps an octave apart or with slight alterations, etc. The following procedure
will allow you to copy sequence data between Sequencer 1 and Sequencer 2.
Let’s say you’d like to copy sequence #7 from SEQ2 to sequence location #15 in SEQ1:
• Select SEQ2
• Select sequence #7
• Hold the SAVE button
• Hold the SEQUENCER 1 button
• Press Step button
It doesn't work. I can save a sequence from one spot to another within SEQ1 or SEQ2, but it doesn't allow copying from SEQ1 to SEQ2 or vice versa.
Firmware 1.1.0.3 is installed.
Edit: It would be really nice if Arturia would post a thread about known bugs!
-
Hi ,This has not been implemented yet .should be in the next update
Terrym
-
Ok so there was a firmware update 8-3-15 (1.1.1.9) I take it this still hasn't been implemented?
7.3 Copy between SEQ1 and SEQ2
The manual I have list 7.3 as Extend a pattern or sequence
What gives, is this not going to be a feature? I'm not even finding a way to do this through the MIDI control center (someone please correct me if I'm wrong)
Seems like a huge oversight to me.
- 2hr owner
-
bump. just upgraded my BSP to 1.2.0.6 and still can't copy/paste between sequencers. do i really have to spend an hour reprogramming the sequence step by step on the other sequencer when it should be a feature that takes 3 seconds? any word on this?
-
This is really crazy. Mind = blown...
-
So, its in the manual, but not implemented over 3 months later??
:o :o :o :o
Surely coding this stuff can't take that long.
(BTW, if this was open source, imagine how many of these really basic things could have been fixed by now - let alone some cool new features)
-
This is fixed in the next update fw
;)
-
....and that can be expected when...?
-
....and that can be expected when...?
very soon testing as we speak!!
Terrym
-
how about in the MCC? is it possible to copy Seq 1's set of patterns (i.e. 1-16) in Project X and paste to Seq 2's bank of patterns (i.e. 1-16) in the same project??? I can't for the life of me figure this out!
-
so check that.....you can pull up Project X in the Project Browser, then click on Seq 2's tab. you can then unfold Project X's details in the Project Browser and manually drag each of the 16 patterns in Seq 1's bank to each of Seq 2's pattern tab, thereby replicating Seq 1's bank to Seq 2's.
I really hope I'm missing something here - I feel like I'm trapped in 1998.
-
Nobody gonna chime on this? Looking for a quicker way to copy and paste and bank of patterns within a project from Seq 1 to Seq 2 without having to manually do it as described above.
-
Terry already chimed in- it's coming in the next update.
Whenever that is....