Arturia Forums
Hardware Instruments => MiniBrute 2S => MiniBrute 2S - General Discussions => Topic started by: tyresebro1 on February 24, 2020, 06:27:00 pm
-
SO I have my Minibrute 2S and 6U Rackbrute, now I would like to add another 6U Rackbrute (above the existing one).
It would be great if the 6U had additional screws on the upper sides to install another 6U on top. Anyone done anything DIY adding another 6U to their existing setup?
How would Arturia advise adding a second 6U to a Minibrute/6U Rackbrute set up?
(Edit: Spam removed - Admin)
-
You could perhaps purchase a couple Link System inserts and mount on the lower RackBrute:
The Link System is open and parts are available to purchase:
https://www.arturia.com/support/linkopensystem
-
I don't think link would work for the upper 6U, because it requires a surface to rest the big bar on.
What might be easier would be to bolt the two upper racks together.
I'm in a similar position and have considered simply going with a second 6U system, or a 6U plus 3U.